This steel frame logistics distribution center delivers 7500sqm of industrial warehouse space with 12 loading dock bays for high-volume logistics operations. The multi bay steel building construction features dual 25m spans with 13m eave height for vertical racking system integration.
| Component | Specification |
|---|---|
| Main Frame | Welded H Section Q355B |
| Connection | Grade 10.9 High Strength Bolts |
| Loading Dock | 12 Bay with Dock Levelers |
| Roof Purlin | Z Section Galvanized Steel |
| Roof Panel | Insulated EPS Sandwich Panel 75mm |
| Wall Panel | Corrugated Color Steel Sheet with Insulation |
Ideal for e-commerce fulfillment centers, third-party logistics warehouses, cross-docking distribution hubs, cold chain logistics facilities, and large-scale inventory management centers requiring high throughput loading capabilities.
Heavy steel components packed on reinforced pallets with heavy duty waterproof wrapping. Dock equipment packed separately. Complete engineering drawings and installation supervision provided.